- Activities
- FRM4SM: Fiducial Reference Measurements for Soil Moisture
- Project deliverables
Project deliverables
Overview
Final project deliverables (Phase 1)
The first project phase ended in May 2023. All outcomes of this phase can be found in the following deliverables:
International Soil Moisture Network (ISMN) research and development
Research and developments regarding the quality control and flagging mechanisms applied to in situ measurements of the ISMN, as well the development of a data versioning system with DOI capability for the ISMN are described in the following deliverable:
Fiducial Reference Measurements
Protocols and procedures that have been developed to calculate (SI-)traceable FRM uncertainty budgets and to identify a set of reliable FRM “super-sites” from existing ISMN networks are described in the following deliverable:
Quality Assurance for Soil Moisture (QA4SM) development and evolution
The following deliverables document all improvements made to the QA4SM online validation platform (https://qa4sm.eu/) as well as contain a detailed software user manual:
- DT3-1 QA4SM Software User Manual
- DT3-2 QA4SM Service Impact Assessment Report
- DT4-2 QA4SM Evolution Test Plan
- DT4-3 QA4SM Verification Report
SMOS case studies
Validation case studies for the SMOS mission that have been conducted as part of the FRM4SM project are documented in the following deliverables: